Presentations 
Introduction to CRYRING and its modification for FLAIR (H. Danared)
pdf
Injection/extraction for CRYRING/LSR (A. Simonsson)pdf
Introduction to FAIR and Decelerated Beams for FLAIR (M. Steck)pdf
FLAIR Buildings and Infrastructure (A. Bräuning-Demian)
pdf
The HITRAP Facility (W. Quint)pdf
Controls and Hardware Interface Concept for FAIR (R. Bär)
pdf
Diagnostics and Data Acquisition at FAIR (P. Forck)
pdf
Control of Vacuum Components and Interlocks at FAIR (H. Reich-Sprenger)

UHV UHV-Control & Diagnostic Control & Diagnostic-System (K. Welzel)
pdf


5 p.m.    tour of ESR and accelerator facilities 
7 p.m.    dinner at GSI guesthouse

March 21, 9 a.m. - 12 a.m.

First Technical FLAIR Meeting on the Integration of

CRYRING into FLAIR

Discussions
rf systems and real time control (H. Klingbeil, P. Moritz)
pdf
electrical installations, power converters (H. Ramakers)

alignment issues (I. Pschorn)

ion sources (P. Spädtke)

magnetic septa (G. Moritz)


GSI, March 20-21, 2006


Agenda


March 20, 2 p.m. - 5 p.m.

2 p.m. - 4 p.m.    further discussions

​​FACILITY FOR LOW-ENERGY ANTIPROTON AND ION RESEARCH